New Road, Cragg Vale, Hebden Bridge, West Yorkshire, HX7 5TT
0808 164 4570

Tank Installs and Decommissions

Commercially sized fuel tanks, typically fabricated in steel, are normally tough and long-lasting.

However, from time to time, they will require a full inspection for weaknesses caused by cracks or erosion, usually from rust.

The regularity of these tank inspections depends on the volumes of product being stored and the nature of their specific operation.

For industrial fuel storage tanks, 5 years is the generally accepted inspection period, with visual and sonic testing required to ensure that they are not at risk of failing and causing costly environmental issues while also negating insurance policies.

Customer needs may require for tanks to be completely decommissioned where sites are due for closure or fuel storage is no longer necessary.

Craggs Environmental is able to decommission tanks of any size. If a new tank is required then Craggs Environmental are experienced in delivering the full tank commissioning process from initial inspections to tank design, manufacture and finally installation.

Craggs Environmental can provide tank services for both metal and plastic tanks which contain red diesel (gas oil), white diesel (derv), kerosene (heating oil), HFO (heavy fuel oil), waste oil, water, solvents, hazardous waste, nitrogen, chlorine and a wide range of chemicals.

For further details on any UK wide tank inspection, installation and decommissioning please contact our team on 01422 882500.

Get In Touch

Fuel Sampling and TestingSpill ResponseNDT TestingTank Base CleanSpill ManagementOn-Site Fuel CleaningFuel Uplift and TransferFuel Storage remote monitoringFuel Tank Installation, removal or testingPipework